Learn about each step of construction for our Vinyl Pools

Step 1

Excavation

Excavation for a vinyl-lined pool is a job for an experienced backhoe operator. Normally the side excavation is approximately two feet beyond the finished pool perimeter to allow for assembly and a concrete footing to be installed.

Step 2

assembly

The second step includes assembly of the steel panels and stairs, coping receptor, skimmer and inlets as well as suction and return plumbing.

Step 3

Bottoms

All bottoms of the pools will be poured with a soft concrete called vermiculite.  Most builders pour the concrete decking once all of step two is completed but in some cases and with certain water table situations, the liner will be installed before the decking is poured. The pool structure is strong enough to allow installation to proceed in either manner.

Step 4

Liner

In this photo the pool is ready for the liner to be installed. This is where an experienced expert makes all the difference!

Step 5

Done

Fill it with water and enjoy all of the health, fitness and entertainment value of a spectacular poolscape in your backyard!

Contact Us

Contact Us
First
Last
reCAPTCHA

1703 Morrell Avenue Connellsville, PA 15425

Store is closed for the season.
Please contact our Belle Vernon store for any assistance.

724-603-3377

733 Broad Ave, Belle Vernon, PA 15012

724-929-4690

Sunday | CLOSED

Monday | 9am-4pm

Tuesday | 9am-4pm

Wednesday | 9am-4pm

Thursday | 9am-4pm

Friday | CLOSED

Saturday | 9am-1pm